Rolls Royce-Large 5000 Amp Main Switchboard

Client
Rolls Royce
Contractor
Dodd Group Eastern Ltd
Date
June 2015
Supplied
Main Switchpanel
Location
Nottingham

Kane Engineering supplied and installed the new main switchpanel that was required for the the new sub station 13 situated at the Rolls Royce project in Nottingham.

Testimonails
  • Testimonails
    • We would like to take this opportunity of thanking Kane Engineering for supplying and installing the new main switchpanel that was required for the the new sub station 13 situated at the Rolls Royce project in Nottingham.

      Feed back from the client and their representatives has been extremely positive on both the operational and aesthetic design

      They not only provided a quality product but did so in a very short space of time, and followed this up with their site installation team ensuring that the transfer from factory to site was carried out in a thoroughly professional manner.

      We would have no hesitation in recommending Kane Engineerings products/services to others based upon the service they provided to ourselves both prior to manufacture and after.

      Richard Freeman